footer_tavola disegno 1.jpeg
amauri-mejia-gvf7rka-e9q-unsplash.jpeg
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
amauri-mejia-gvf7rka-e9q-unsplash.jpeg
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
logoblu

CONTACTS

MARINA

Email: nautica@gruppoantonini.it
Telephone: +39 337225431

SOCIAL MEDIA

ENERGY

Email: info@gruppoantonini.it
Telephone: +39 0187560746

ANTONINI NAVI

Email: info@antonininavi.com
Telephone: +39 3355948129

Website: www.antonininavi.com


linkedin
facebook
instagram
bianco

LOAD OUT OF PRE-DRILLING TEMPLATE FOR PPE PLATFORM

2024-09-19 10:59

author

LOAD OUT OF PRE-DRILLING TEMPLATE FOR PPE PLATFORM

Load Out activities and sail away of Pre Drilling Template for “PPE” and "WHPA" platforms

 

 

 

LOAD OUT OF PRE-DRILLING TEMPLATE  FOR PPE PLATFORM

 

 

 

On September 17, 2024, the Load Out activity for the Pre-Drilling Template for the “PPE” and “WHPA” platforms was initiated. The activity was organized into three phases: Load Out of the Pre-Drilling Template for the PPE platform, Load Out of the Pre-Drilling Template for the WHPA platform, and sea fastening and sail away of the structures.

Destination: Libya

Client: MOG Mellitah Oil & Gas.


A pre-drilling template for a platform, particularly in the context of offshore oil and gas exploration, is essentially a detailed plan that outlines all the preparations required before starting drilling operations. It serves as a strategic guide, ensuring that every aspect is prepared for the drilling process, minimizing risks and improving operational efficiency.

Typically, the template begins with defining the site layout, specifying exactly where the wells should be drilled, either on the platform or the seabed. It provides a reference for engineers and drilling teams, ensuring the proper positioning of the wells. Additionally, the pre-drilling template includes engineering plans that detail the specifications of the equipment required for drilling, such as the types of casing and other materials. It also provides the exact trajectories that the wells must follow, ensuring the correct angle and depth.

m3-14---copia.jpeg
m3-4.jpegimg_1707.jpegm3-7.jpeg

LOAD OUT OF PRE DRILLING TEMPLATE FOR WHPA PLATFORM ON BOARD OF CLAUDIO 1 BARGE

09-23-24

whatsapp-image-2024-09-21-at-12.21.04.jpeg

SAIL AWAY OF PREDRILLING TEMPLATE FOR PPE AND WHPA PLATFORMS 

01-01-24

antonini-m3-01-10-2024-12.jpegantonini-m3-01-10-2024-2.jpegantonini-m3-01-10-2024-16.jpeg
antonini-m3-01-10-2024-8---copia.jpegantonini-m3-01-10-2024-11.jpegantonini-m3-01-10-2024-15.jpeg
20241014_215303.jpeg20241012_094950.jpeg20241005_084751.jpeg

Gruppo Antonini S.p.A. Registered Office: Via Enrico Fermi 7 - 54026 Groppoli (MS) Italy - VAT NUMBER IT00364890459

Privacy Policy

Design @ All Right Reserved 2020 - Sito web made by Marketing Department

Cookie Policy