amauri-mejia-gvf7rka-e9q-unsplash.jpeg
footer_tavola disegno 1.jpeg
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
amauri-mejia-gvf7rka-e9q-unsplash.jpeg
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. 
logoblu

CONTACTS

SOCIAL MEDIA

ENERGY

Email: info@gruppoantonini.it
Telephone: +39 0187560746

ANTONINI NAVI

Email: info@antonininavi.com
Telephone: +39 3355948129

Website: www.antonininavi.com

MARINA

Email: nautica@gruppoantonini.it
Telephone: +39 337225431


linkedin
facebook
instagram
bianco

NEW EPC CONTRACT IN THE MEDITERRANEAN SEA (WHPA PROJECT)

2024-08-04 15:31

author

NEW EPC CONTRACT IN THE MEDITERRANEAN SEA (WHPA PROJECT)

Antonini Group, operating globally in the Oil & Gas sector for over 80 years, has secured a new contract for EPCIC activities.



FOR ANTONINI GROUP A NEW EPC CONTRACT IN THE MEDITERRANEAN SEA




Gruppo Antonini, operating globally in the Oil & Gas sector for over 80 years, has won a new contract for EPCIC (Engineering, Procurement, Construction, Installation, and Commissioning) activities for an offshore project in the Mediterranean. This project has a total value of approximately 300 million euros and has been awarded to the consortium formed by Gruppo Antonini, Rosetti Marino Spa, and Kerry Project Logistics (Italy) Spa, by Mellitah Oil & Gas BV - Libyan Branch (National Oil Corporation of Libya and Eni North Africa).





img_20180424_100825.jpeg

 

The project involves the construction of a new gas production platform, weighing over 20,000 tons, which will be installed off the Libyan coast, in the Bahr Essalam offshore field. Gruppo Antonini will be responsible for activities including the construction of the LIVING QUARTER, HELIDECK, foundation PILES, commissioning activities, and the start-up of the offshore facilities.

 

 

The WHPA platform will include a JACKET weighing approximately 7,000 tons, 8 foundation PILES weighing about 5,000 tons, a TOPSIDE with the associated FLARE weighing around 8,000 tons, a LIVING QUARTER weighing approximately 800 tons, and a preliminary weight of over 2,000 tons for the FMWR (Fast Moving Workover Rig). The project is expected to be completed by the second quarter of 2028.

whpa.jpeg

This significant order is the second one obtained by Mellitah Oil & Gas BV from the Gruppo Antonini. Last summer, the Company bid worth over 200 million euros for the Sabratha Platform Compression Module Project, a compression module intended to be installed on the existing SABRATHA gas platform, 42 meters above sea level and 120 km off the Libyan coast.

Gruppo Antonini S.p.A. Registered Office: Via Enrico Fermi 7 - 54026 Groppoli (MS) Italy - VAT NUMBER IT00364890459

Model 231 & Whistleblowing

Privacy Policy

Design @ All Right Reserved 2020 - Sito web made by Marketing Department

Cookie Policy

Create Website with flazio.com | Free and Easy Website Builder