Construction engineering, material supply, fabrication, assembly, mechanical completion and pre-commissioning, load-out and sea-fastening, transportation to site, offshore installation with a SINGLE LIFT of a module comprising: 3-level deck, 12 x 12 meters, 250 tons, fully equipped with mechanical components, piping lines, valves, E/I equipment, cables and conduits. Main elements were supplied by the Client. GA performed the EPC for 4 vessels also to be installed on the module. The vessels are made of stainless steel and super duplex.
Launching at the Muggiano site of Gruppo Antonini